Hint:
Performing the intelligent tester active test allows relay, vsv, actuator and other items to be operated without removing any parts. Performing the active test early in troubleshooting is one way to save time.
The data list can be displayed during the active test.

Diagnosis system
On-vehicle inspectionInspection
Inspect generator brush holder assembly
Using a vernier caliper, measure the brush length.
Standard length:
9.5 To 11.5 Mm (0.374 To 0.453 In.)
Minimum length:
4.5 Mm (0.177 In.)
If the brush length is less than the minimum, replace
the generator brush holder assembly.
Inspe ...
Fuel tank
Components
Removal
Discharge fuel system pressure (see page
fu-9)
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal to
prevent airbag and seat belt pretensioner activation.
...
Rear drive shaft assembly
Components
Removal
Hint:
Use the same procedures for the rh side and lh side.
The procedures listed below are for the lh side.
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery termin ...