Hint:
Performing the intelligent tester active test allows relay, vsv, actuator and other items to be operated without removing any parts. Performing the active test early in troubleshooting is one way to save time.
The data list can be displayed during the active test.

Diagnosis system
On-vehicle inspectionCenter airbag sensor communication stop mode
Description
Wiring diagram
Inspection procedure
Notice:
Turn the ignition switch off before measuring the resistances of the
main wire and the branch
wire.
After the ignition switch is turned off, check that the key reminder
warning system and light
reminder warning system ...
Installation
Install fan and generator v belt
Using sst and 19 mm socket wrench, loosen the vribbed
belt tensioner arm clockwise, then install the
fan and generator v belt.
Sst 09216-42010
Notice:
Be sure to connect sst and the tools so that
they are in line during use.
When retracti ...
Yaw rate and deceleration sensor
Components
Removal
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal to
prevent airbag and seat belt pretensioner activation.
Remove front seat assembly lh
For manual seat: ...