Utility vehicle
precautionsInstallation
Hint:
Use the same procedures for the rh side and lh side.
The procedures listed below are for the lh side.
Install front door belt moulding
assembly lh
Attach the claws to install the belt moulding.
Hint:
Confirm that the moulding is firmly installed.
Install outer r ...
Installation (2006/01- )
Install no. 1 Roof silencer pad
W/o sliding roof:
Install the 5 silencer pads.
W/ sliding roof:
Install the 2 silencer pads.
Install no. 3 Roof silencer pad
Install no. 1 Roof wire
Only when replacing the roof headlining:
Align the marking, and then ...
Removal
Drain engine coolant (see page co-6)
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal to
prevent airbag and seat belt pretensioner activation.
Remove air cleaner cap (see page es-41 ...