Manual air conditioning
systemFront wiper motor
Inspection
Inspect front wiper motor
Check the lo operation.
Connect the battery's positive (+) lead to
terminal 5 (+1) and the negative (-) lead to
terminal 4 (e), and check that the front wiper
motor operates at low speed (lo).
Ok:
front wiper motor operates at low sp ...
Terminals of ecu (2005/11-2006/01)
Check air conditioning amplifier
Measure the voltage and resistance of the
connectors.
Hint:
Check from the rear of the connector while it is
connected to the air conditioning amplifier.
using an oscilloscope, check waveform 1.
Can communication signal
Hint:
...
Data list / active test
Active test
Hint:
Performing the intelligent tester active test allows
relay, vsv, actuator and other items to be operated
without removing any parts. Performing the active
test early in troubleshooting is one way to save time.
The data list can be displayed during the active
test.
...