Hint:
Performing the intelligent tester active test allows relay, vsv, actuator and other items to be operated without removing any parts. Performing the active test early in troubleshooting is one way to save time.
The data list can be displayed during the active test.

Diagnosis system
On-vehicle inspectionLuggage cover (if
equipped)
â– Installing the luggage cover
1. Compress the both ends of
the luggage cover and insert
into the recess to install.
2. Pull out the luggage cover
and hook it onto the anchors.
â– Removing the luggage
cover
1. Release the cover from the
left and right anchors and
allow it to retract.
2. Compre ...
Installation
Install upper instrument panel
Attach the 6 clips and 5 claws to install the
instrument panel.
Connect the connectors and clamps.
Install the 2 bolts and 2 screws.
Connect the passenger airbag connector.
Install the 2 bolts to the passenger airbag.
Torque: 20 n*m (204 k ...
Front seat cushion heater
Inspection
Inspect front seat cushion heater
assembly lh
Measure the resistance of the seat cushion heater.
Standard resistance
If the result is not as specified, replace the seat
cushion heater assembly.
Heat the thermostat with a light.
Measure the resistance of the sea ...