Hint:

Standard voltage: 11 to 14 v
If the voltage is below 11 v, recharge or replace the battery before proceeding.

Result 

Result 


End
System description
InitializationStarting system
Parts location
System diagram
The starting system rotates the starter motor according to the
signals from the ignition switch and pnp switch.
...
Short in front driver side pretensioner squib circuit
Description
The driver side front pretensioner squib circuit consists of the center
airbag sensor and the front seat
outer belt lh.
This circuit instructs the srs to deploy when the deployment conditions are met.
These dtcs are recorded when a malfunction is detected in the front prete ...
Only back door lock / unlock functions do not operate
Description
The main body ecu receives lock / unlock switch signals and activates the
door lock motor accordingly.
Wiring diagram
Inspection procedure
Inspect back door with motor lock assembly
Apply the battery voltage to the door lock motor and
check the operation of the d ...