Horn
Headlight switchInstallation
Install throttle body
Install a new gasket onto the intake manifold.
Install the throttle body and fuel pipe clamp with the
4 bolts.
Torque: 30 n*m (305 kgf*cm, 22 ft.*Lbf)
Connect the fuel tube into the clamp.
Connect the wire harness clamp.
Connect the throttle posi ...
Camshaft position "a" actuator circuit (bank 1)
Dtc P0010 Camshaft
position "a" actuator circuit (bank
1)
Description
The variable valve timing (vvt) system includes the ecm, ocv and vvt
controller. The ecm sends a
target duty-cycle control signal to the ocv. This control signal regulates the
oil pressure supplied to the ...
Tire inflation pressure
Tire inflation pressure
The recommended cold tire inflation
pressure and tire size are displayed
on the tire and loading
information label.
Inspection and adjustment procedure
Tire valve
Tire pressure gauge
Remove the tire valve cap.
Press the tip of the tire pressure gaug ...