Notice:
Make sure that the o-ring is not cracked or jammed when installing it.

Torque: 9.0 N*m (90 kgf*cm, 80 in.*Lbf)

Inspection
Crankshaft position sensorCheck for intermittent problems
Check for intermittent problems
Hint:
A momentary interruption (open circuit) in the connectors
and/or wire harness between the sensors and ecus can
be detected by using the ecu data list function of an
intelligent tester.
Turn the ignition switch off and connect the
intelligent test ...
Fog light relay
On-vehicle inspection
Inspect front fog light relay
Remove the front fog relay from the no. 6 Relay
block.
Measure the resistance of the relay.
Standard resistance
If the result is not as specified, replace the relay. ...
Brake switch "b" circuit high
Description
The purpose of this circuit is to prevent the engine from stalling while
driving in the lock-up condition when
the brakes are suddenly applied.
When the brake pedal is depressed, this switch sends a signal to the ecm. Then
the ecm cancels the
operation of the lock-up clutch ...