Hint:

Standard voltage: 11 to 14 v
If the voltage is below 11 v, recharge or replace the battery before proceeding.

Result 

Result 


End
System description
InitializationPressure control solenoid "B" performance (shift solenoid valve sl2)
Description
The ecm uses signals from the output shaft speed sensor and input speed
sensor to detect the actual
gear position (1st, 2nd, 3rd or o/d gear).
Then the ecm compares the actual gear with the shift schedule in the ecm memory
to detect mechanical
problems of the shift solenoid ...
Check for short circuit
If the wire harness is ground shorted (fig. 5), Locate
the section by conducting a resistance check with
the body ground (below).
Check the resistance with the body ground.
Disconnect connectors a and c, and measure
the resistance
Standard resistance (fig. 6)
Hint:
Measure ...
Starter relay
On-vehicle inspection
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal to
prevent airbag and seat belt pretensioner activation.
Remove starter relay
Remove the starter relay fr ...