
Standard width 
Daytime running light relay
On-vehicle inspection
Inspect day time running light relay
Remove the no. 2 Relay, no. 3 Relay and no. 4 Relay
from the engine room no. 2 Relay block.
Measure the resistance of the relays.
Standard resistance:
No. 2, No. 4
No. 3
If the result is not as specified, replace th ...
Disassembly (2006/01- )
Remove front axle inboard joint boot no. 2 Clamp
One touch type:
using a screwdriver, remove the inboard joint boot
clamp, as shown in the illustration.
Claw engagement type:
using needle-nose pliers, remove the inboard joint
boot clamp, as shown in the illustration.
Rem ...
Communication
Description
The skid control ecu sends signals such as cruise control cancel demand
signals and brake operation
demand from ecm response signals to the ecm when the cruise control system is in
operation.
Inspection procedure
Hint:
This circuit uses can communication. Therefore, if t ...