Toyota RAV4 (XA40) 2013-2018 Service Manual: Drl relay circuit
Description
The main body ecu controls the daytime running light no. 2 Relay (marking:
drl no.2).
Wiring diagram

Inspection procedure
- Inspect daytime running light relay (marking: drl no. 2, Drl no. 3,
Drl no. 4)

- Remove the no. 2 Relay, no. 3 Relay and no. 4 Relay from
the engine room no. 2 Relay block.
- Measure the resistance of the relays.
Standard resistance:
No. 2, No. 4 
No. 3 
- Inspect fuse (head lh)
- Remove the head lh fuse from the engine room no. 2
Relay block.
- Measure the resistance of the fuse.
Standard resistance:
below 1 

- Inspect headlight bulb (high)

- Remove the headlight bulb (high).
- Connect the positive (+) lead from the battery to terminal
2 and the negative (-) lead to terminal 1, then check that
the bulb illuminates.

- Check wire harness (battery - no. 2 Daytime running light relay)

- Remove the no. 2 Daytime running light relay from the
engine room no. 2 Relay block.
- Measure the voltage of the relay block.
Standard voltage 

- Check wire harness (no. 2 Daytime running light relay - headlight
bulb and body ground)

- Remove the no. 2 Daytime running light relay from the
engine room no. 2 Relay block.
- Disconnect the a14 and a22 headlight (high)
connectors.
- Measure the resistance of the wire harness side
connectors and relay block.
Standard resistance 

- Check wire harness (main body ecu - battery)

- Disconnect the e16 main body ecu connector.
- Measure the voltage of the wire harness side connector.
Standard voltage 

Replace instrument panel junction block (main body ecu)
Description
When the light control switch, located on the headlight dimmer switch, is
turned to the head position, the
head relay illuminates the headlights.
Wiring diagram
Inspection proced ...
Description
The body ecu controls the headlight relay, no. 2 Daytime running light relay
(marking: drl no. 2) And
no. 4 Daytime running light relay (marking: drl no. 4).
Wiring diagram
I ...
Other materials:
Installation
Hint:
Use the same procedures for the rh side and lh side.
The procedures listed below are for the lh side.
Install front door belt moulding
assembly lh
Attach the claws to install the belt moulding.
Hint:
Confirm that the moulding is firmly installed.
Install outer r ...
Combination meter ecu communication stop mode
Description
Wiring diagram
Inspection procedure
Notice:
Turn the ignition switch off before measuring the resistances of the
main wire and the branch
wire.
After the ignition switch is turned off, check that the key reminder
warning system and light
reminder warning system ...
Footwell light circuit
Description
The main body ecu receives information regarding the door lock position
switch and ignition switch, and
turns on each foot light.
Wiring diagram
Inspection procedure
Perform active test by intelligent tester (main body ecu)
Connect the intelligent tester (with can vim ...