Lighting
Parts locationInstallation
Install rear differential support
Install the differential support to the differential
carrier with the 4 bolts.
Torque: 98 n*m (999 kgf*cm, 72 ft.*Lbf)
Install rear differential no. 1 And no. 2 Support
Install the differential no. 1 And no. 2 Supports with
the 4 bo ...
Installation (2005/11-2006/01)
Install no. 1 Roof silencer pad
W/o sliding roof:
Install the 5 silencer pads.
W/ sliding roof:
Install the 2 silencer pads.
Install no. 3 Roof silencer pad
Install no. 1 Roof wire
Only when replacing the roof headlining:
Align the marking, and then ...
General maintenance (2005/11-2006/01)
General notes
Maintenance requirements vary depending on the
country.
Check the maintenance schedule in the owner's
manual supplement.
Following the maintenance schedule is mandatory.
Determine the appropriate time to service the vehicle
using either miles driven or time elapsed ...