Sliding roof control switch circuit
Components (2005/11-2006/01)Pig power supply voltage malfunction
Description
When a problem occurs in the system, the power source relay circuit is shut
off to stop the power assist.
Wiring diagram
Inspection procedure
Read value of intelligent tester (pig power supply)
Connect the intelligent tester (with can vim) to the
dlc3.
Turn ...
Vanity light
Components
Removal
Hint:
Use the same procedures for the rh and lh sides.
The procedures listed below are for the lh side.
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal t ...
Ecm communication stop mode (2005/11-2006/01)
Description
Wiring diagram
Inspection procedure
Notice:
Turn the ignition switch off before measuring the resistances of the
main wire and the branch
wire.
After the ignition switch is turned off, check that the key reminder
warning system and light
reminder warning system ...