Hint:
Standard voltage: 11 to 14 v
If the voltage is below 11 v, recharge or replace the battery before proceeding.





End
System description
Operation checkVehicle speed sensor "A"
description
The speed sensor detects the wheel speed and sends the appropriate signals to
the skid control ecu.
The skid control ecu converts these wheel speed signals into a 4-pulse signal
and outputs it to the ecm
via the combination meter. The ecm determines the vehicle speed based o ...
Blower motor
On-vehicle inspection
Inspect blower motor (for automatic air conditioning system)
Disconnect the blower motor connector.
Connect the positive (+) lead from the battery to
terminal 1 and negative (-) lead to terminal 2, and
then check that the motor operates smoothly.
If the ...
Using the radio
Power
Volume
Adjusting the frequency
Scanning for receivable stations
Am/fm mode button
Station selectors
Seeking the frequency
Displaying text message
Setting station presets
Search for the desired stations by turning the ¢Â§tune¢escroll¢¸
knob or ...