Hint:

Standard voltage: 11 to 14 v
Hint:
If the voltage is below 11 v, recharge or replace the battery before proceeding.
Result: 






End
System description
Operation checkTorque sensor
Description
The torque sensor converts the rotation torque input from the steering wheel
into electric signals and
sends them to the power steering ecu.
Wiring diagram
Inspection procedure
Check connector connection condition (torque sensor - ecu)
Check the installation c ...
Vehicle speed sensor
Description
Refer to the sfi system (see page es-224).
Wiring diagram
Refer to the sfi system (see page es-224).
Inspection procedure
Refer to the sfi system (see page es-224). ...
Removal
Drain engine coolant (see page co-6)
Disconnect cable from negative battery
terminal
Caution:
Wait at least 90 seconds after disconnecting the
cable from the negative (-) battery terminal to
prevent airbag and seat belt pretensioner activation.
Remove air cleaner cap (see page es-41 ...