Instrument clusterInstallation
Install throttle body
Install a new gasket onto the intake manifold.
Install the throttle body and fuel pipe clamp with the
4 bolts.
Torque: 30 n*m (305 kgf*cm, 22 ft.*Lbf)
Connect the fuel tube into the clamp.
Connect the wire harness clamp.
Connect the throttle posi ...
Skid control buzzer circuit
Description
The skid control buzzer sounds while the vsc is activated.
Wiring diagram
Inspection procedure
Notice:
When replacing the abs and traction actuator, perform the zero point
calibration (see page bc-
24).
Check can communication system
Check if the can communication d ...
Unlock warning switch
Inspection
Inspect unlock warning switch assembly
Measure the resistance of the switch.
Standard resistance
If the result is not as specified, replace the switch
assembly.
Ecu power source circuit
Description
This circuit provides power to operate the transponder key ecu.
Wir ...