Components

Mil circuit
On-vehicle inspectionSkid control buzzer circuit
Description
The skid control buzzer sounds while the vsc is activated.
Wiring diagram
Inspection procedure
Notice:
When replacing the abs and traction actuator, perform the zero point
calibration (see page bc-
24).
Check can communication system
Check if the can communication d ...
Refueling
Opening the fuel tank cap
Perform the following steps
to open the fuel tank cap:
Before refueling the vehicle
Close all the doors and windows,
and turn the engine
switch to OFF.
Confirm the type of fuel.
â– Fuel tank opening for unleaded
gasoline
To help prevent incorrect fueling,
your vehicle ...
Initialization
Zero point calibration
Notice:
Make sure that the front passenger seat is not
occupied before performing the operation.
Hint:
Perform the zero point calibration and sensitivity check if
any of the following conditions apply.
The occupant classification ecu is replaced.
Accessories ( ...