Brk relayShort in can bus lines
Description
There may be a short circuit between the can bus lines when the resistance
between terminals 6 (canh)
and 14 (canl) of the dlc3 is below 54
.
Wiring diagram
Inspection procedure
Notice:
Turn the ignition switch off before measuring the resistances of the
main ...
Initialization
Initialize sliding roof drive gear subassembly
Notice:
When replacing the sliding roof drive gear, the
sliding roof drive gear requires initialization. If a
reset is not executed, the following functions do not
operate: auto operation and key off operation.
Turn the ignition switch on. ...
Checking monitor status
Perform monitor drive pattern
Connect the intelligent tester to the dlc3.
Turn the ignition switch and the tester on.
Clear the dtcs (see page es-35).
Run the vehicle in accordance with the applicable
drive pattern described in readiness monitor
drive pattern (see page es-19). Do ...