Radiator
Emission control systemCheck for open circuit
For an open circuit in the wire harness in fig. 1,
Check the resistance or voltage, as described below.
Check the resistance.
Disconnect connectors a and c, and measure
the resistance between them.
Standard resistance (fig. 2)
Hint:
Measure the resistance while lightly s ...
Installation
Install upper instrument panel
Attach the 6 clips and 5 claws to install the
instrument panel.
Connect the connectors and clamps.
Install the 2 bolts and 2 screws.
Connect the passenger airbag connector.
Install the 2 bolts to the passenger airbag.
Torque: 20 n*m (204 k ...
Transmitter id not registered in main mode
Description
Inspection procedure
Notice:
It is necessary to register an id code after replacing the tire pressure
warning valve and
transmitter and/or the tire pressure monitor ecu (see page tw-9).
Hint:
Set the tire pressure to the specified value.
Standard pressure:
220 kpa (2.2 ...