Refrigerant line
ComponentsInstallation
Install rear differential support
Install the differential support to the differential
carrier with the 4 bolts.
Torque: 98 n*m (999 kgf*cm, 72 ft.*Lbf)
Install rear differential no. 1 And no. 2 Support
Install the differential no. 1 And no. 2 Supports with
the 4 bo ...
Terminals of ecu
Check instrument panel junction block (main body ecu)
Disconnect the ib and ie junction block connectors.
Measure the voltage and resistance of the wire
harness side connectors.
Reconnect the ib and ie junction block connector.
Measure the voltage of the wire harness ...
Installation
Hint:
Use the same procedures for the lh side and rh side.
The procedures listed below are for the lh side.
A bolt without a torque specification is shown in the
standard bolt chart (see page ss-2).
Install front shoulder belt anchor adjuster assembly
Align the adjuster pos ...