Installation
Charging systemInstallation
Install no. 2 Chain sub-assembly
Set the crankshaft key in the left horizontal position.
Turn the cutout of the drive shaft so that it faces
upward.
Align the yellow mark links with the timing marks of
each gear as shown in the illustration.
Install the sprockets onto ...
Initialization
Initialize sliding roof drive gear subassembly
Notice:
When replacing the sliding roof drive gear, the
sliding roof drive gear requires initialization. If a
reset is not executed, the following functions do not
operate: auto operation and key off operation.
Turn the ignition switch on. ...
Exhaust pipe
Installation
Install front exhaust pipe assembly
Using a vernier caliper, measure the free length of
the compression spring.
Minimum length:
41.5 Mm (1.634 In.)
If the length is less than the minimum, replace the
compression spring.
Install a new gasket by hand so that its ...